Effective Commissioning, Shutdowns and Turnarounds

18th-19th April 2018 | Mumbai | India

Course Description

Effective Commissioning, Shutdowns, and Turnarounds 

Introduction:

The Purpose of this training is to understand how the oil and gas, OIL Refinery units and Equipment's Operated in a safe Manner and the Standard Operating Procedures (SOP's) to be followed for Normal Operations with safe Operating limits, Shut down of units (Normal & Emergency), Turn Around after shut down and safe start to bring the units / equipment's for Normal operation .
Shutdowns, Turn around and outages are usually sizable activities executed under strict time Constraints with severe financial impacts for projects delay. These are also subject to significant potential scope changes that arise from finding and extra work during outage period and require rapid decision making and approvals that cannot be avoided. Making effective project controls is one of the most important elements in successfully executing a shutdown or turnaround Activities.

Benefits of attending the training:
  • Overall the training will impart extensive knowledge in proper planning & scheduling
  • Project control measures to avoid cost escalation and Delay in start-up
  • Material, Manpower Planning
  • Requirement of safety Permit to work systems, LOTO, Isolations Permits (Mechanical & Electrical equipment)
  • Cause & Effect Matrix, F & G systems, Gas detection, Pipeline
  • Equipment Inspection for safe execution of Shutdown Turnaround, start-up and continuous operations activities

For delegate registration & enquiries contact us on: raj@marcepinc.com or Tel: +91- 22- 62210100

Training Agenda

Effective Commissioning, Shutdowns, and Turnarounds 

Two Days Training Agenda

Introduction

Purpose

General Considerations
1. Personnel Safety
2. Emergency  Response
3. Process Safety (PTW , HAZID )
4. Communication
5. Recommended and Operating Procedures

Commissioning :
1. Why do we require to commission the Newly construction Plant
2. Commissioning  Methodology
3. Commissioning Priorities
4. Commissioning of Control system, safety systems, Cause & Effect Matrix
5. Utilities commissioning
6. Commissioning of Process equipment & units.

Start-Up Preparation & Procedures
1. Plant start-up sequence
2. Feed Introduction and stabilization
3. Feed Ramp up as per design conditions
4. Parameters Adjustments for Continuous Operations
5. Troubleshooting Operations

Normal Start up after short shut down ( Hot Startup)

Re startup after Long shut down ( Cold Start)

Normal Shut Down of Equipment's & Units
1. Bringing plant load as planned
2. Isolations
3. Preparation for Turn around  and Maintenance 

Emergency shutdown
1. Safe Guarding systems and equipment's
2. Verification of causes for Failure as follows
3. Feed Failure
4. Power Failure
5. Utility failure  including Instrument Air Failure
6. Explosion, fire, Line Rupture and serious leak

General Discussion about work Place safety

Question and Answer session to ascertain their understanding.

Course Director

Course Director: Kalatheeswaran. S. Having more than 30 years of experience in the Oil & Gas EPC Projects Worked with oil and gas majors like Shell, Total, Technip, Saipem and Petrofac, Mcdermott, Reliance, Hyundai and clients like ADCO, ADMA-OPCO, ARAMCO, NIOC, ONGC, KOC, Petronas and Cairn Energy both in onshore/offshore brownfield & Greenfield projects, Petrochemical, Power, Oil & Gas Projects worldwide. Conducted and chaired HAZID / HAZOP / PHSER / LOPA / SIL Sessions for Major clients such as KOC, Reliance, GAIL, Total and Saipem etc. Safety Risk Management Oil & Gas brownfield projects Performance Adequacy Check & Recommendations. Pre- Commissioning, Commissioning, Power plant Commissioning and start-up, Flawless Start-up/ Shutdown and Turnaround Management